Case study
Warsaw Targowa
Rooftop PV structure in a demanding urban environment
Challenge
Rooftop PV structure in a demanding urban environment
The project combined the actual roof geometry, local wind flow, installation constraints and the capacity of an existing tall building.
Scope of work
- review of available documentation
- calculation model and key load cases
- verification of critical interfaces
- clear recommendations for implementation
Project approach
From project inputs to an implementable solution
The work started with a review of the available documentation, actual geometry and project constraints. Critical input data and load cases were agreed before modelling.
The analysis connected global structural behaviour with local interfaces, wind effects and installation requirements. Results were checked for consistency and translated into practical recommendations.
The final documentation recorded the assumptions, critical zones and conditions required for safe implementation.