Case study

Industrial hall

From roof zoning to a practical ballast map

Challenge

From roof zoning to a practical ballast map

Ballast was varied according to the location of each table, avoiding one overly conservative value across the entire industrial roof.

Scope of work

  • review of available documentation
  • calculation model and key load cases
  • verification of critical interfaces
  • clear recommendations for implementation

Project approach

From project inputs to an implementable solution

The work started with a review of the available documentation, actual geometry and project constraints. Critical input data and load cases were agreed before modelling.

The analysis connected global structural behaviour with local interfaces, wind effects and installation requirements. Results were checked for consistency and translated into practical recommendations.

The final documentation recorded the assumptions, critical zones and conditions required for safe implementation.

New project

Do you have documentation or a structural problem to solve?

Request a quote